ECM Buyers' Guide
  

Survey Suggests Slight Recovery for Nonresidential Construction in Q2

U.S. nonresidential construction market expected to see slight recovery in 2009, according to second quarter report from FMI

According to a quarterly survey of construction executives in the nonresidential building market from FMI, Raleigh, N.C., contractors have “begun to recover from the initial shock of falling markets and are revamping their strategies to account for current market conditions.” In its second quarter report, the upward movement of the firm's Nonresidential Construction Index (NRCI) from 35.6 in Q1 to 45.0 in Q2 suggests fewer respondents consider the current business climate worse than last quarter, which is a good sign. Although it's too soon to determine if the bottom of the recession will hit in the second quarter, the report indicates that respondents are preparing for more competitive markets until they have a better idea as to whether or not the recession will stretch into 2010 — or if the flood gates will open on a new building boom.

Based on the survey feedback, project cancelations and delays continue at the same pace as last quarter. However, with project delays running at 20% of backlog and cancelations at 10%, FMI says it's safe to assume that many of those owners are not considering their next project until they can get the last one off the ground. Waiting for funds to free up from stimulus money — or banks to be more forthcoming with loans — will inevitably cause an additional drag on the recovery. However, as contractors work to create survival strategies, FMI recommends they must also consider contingency strategies that prepare their companies for the possibility of a rapid recovery for construction.

Although passage of the American Recovery and Reinvestment Act of 2009 (ARRA) promises some economic relief, the survey indicates that nonresidential building contractors are realizing stimulus funds won't bring an immediate cure for declining backlogs. For example, 88% of panelists said they had not yet seen the effects of the stimulus bill. However, 23% expect the bill will increase their backlogs as much as 5% in the next year. Following are a few comments from respondents regarding the effects of the stimulus bill on their businesses:

  • “As an electrical contractor, we lag market trends by six to nine months. Given the uncertainty as to the timing, location, and size of stimulus-bill projects, it is too early to estimate the impact of the stimulus bill. Our backlog in education and health care projects will definitely increase. However, much of our current backlog is in hotels, casinos, and office buildings where we do not expect substantial help from the stimulus bill. Certainly, as the overall economy improves, our backlog will grow, and we expect to see a positive trend by the second quarter of 2010.”

  • “It looks like a big false alarm for us. Projects are focused on road building and small “green” retrofits to office buildings — much ado about nothing.”

  • “Stimulus money for roads and bridges, Medicare, education (training/retention) won't create jobs for plumbers, pipefitters, sheet metal workers, and electricians. While the federal agencies seem to have earmarked funds for states and for specific projects, we've yet to see that money deployed in energy or infrastructure projects. Rather, the shovel-ready work seems to be roads and bridges that were already on the drawing boards (for Iowa, Nebraska and Kansas).”

©2009. Referenced with permission from FMI Corporation, 919.787.8400. For more information, visit www.fminet.com or call Tom Smith at 919.785.9236.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues