Code Quandaries

Stumped by the Code?

All questions and answers are based on the 2005 NEC.

Q. What are the requirements for installing 15A or 20A receptacles in wet locations?

A. All 15A and 20A receptacles in wet locations must be placed within an enclosure that's weatherproof and remains weatherproof when an attachment plug is inserted in the receptacle [406.8(B)] (Fig. 1). According to Art. 100, a wet location would be an area subject to saturation with water or an unprotected location exposed to weather.

Fig. 1. Receptacle covers are only effective if they provide protection when a plug is inserted.

Q. Must metal siding and metal framing members be grounded?

A. I think what you're trying to ask is whether the NEC requires metal siding and framing to be bonded to an effective ground-fault current path, and the answer is no, not specifically [250.4(A)(4)]. However, exposed structural metal that forms a metal building frame must be bonded to one of the following (effective ground-fault path) [250.104(C)] (Fig. 2):

  • Service equipment enclosure

  • Grounded neutral service conductor

  • Grounding electrode conductor sized in accordance with Table 250.66

  • One of the electrodes of the grounding electrode system

The bonding jumper for structural metal is sized to the conductors that supply the building or structure, in accordance with Table 250.66. In addition, the bonding jumper must be:

  • Copper, where within 18 inches of earth [250.64(A)].

  • Securely fastened and not exposed to physical damage [250.64(B)].

  • Installed without a splice or joint, unless spliced by compression connectors or by the exothermic welding process [250.64(C)].

Fig. 2. Metal siding doesn’t need to be bonded because it isn’t part of the building’s frame.

Q. Where there are two service disconnects installed on one side of the meter, can I run the service conductors through one disconnect to feed the second?

A. You can if adequate space is provided in the first disconnect (312.8) (Fig. 3). In fact, this is the way I have my service installed.

Q. We installed access and security control equipment in a factory. The power source is in a breaker panel, and the employees have learned how to disable the system by turning the breaker off and waiting for the battery to discharge. Does the Code permit the use of a padlock on the panel door to restrict access?

Fig. 3. Service conductors may run through one disconnect to feed a second if you have space.

A. The NEC doesn't prohibit you from locking panel doors or placing a padlock on a circuit breaker to restrict access.

Q. If a single 20A, 125V laundry receptacle is located within six feet of the laundry tub, is GFCI protection required?

A. Yes, GFCI protection is required for all 15A and 20A, 125V receptacles located within an arc measurement of 6 feet from the dwelling unit laundry, utility, and wet bar sink [210.8(A)(7)].

Q. Where in the Code can I find the requirements for locating smoke detectors in single-family dwelling units?

A. The requirements are in NFPA 72, National Fire Alarm Code, not the NEC.

Q. What size equipment grounding (bonding) conductor is required in each of four raceways for a 1,600A, 120/208V, 3-phase feeder?

A. 4/0 AWG. When circuit conductors are run in parallel [310.4, 250.122(F)], an equipment grounding (bonding) conductor must be installed with each parallel conductor set, and it must be sized to the ampere rating of the circuit-protection device in accordance with Table 250.122.

Got a Code question for Mike? E-mail him at mike@mikeholt.com for help.






Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues