Make PQ Monitoring Meaningful

Finding voltage quality problems is a lot like detective work. You rely on the power line monitor to gather evidence of any unseen disturbances. But, how can you ensure a safe monitor hookup and meaningful captured data?

Power line monitors capture and display power disturbance waveforms that can disrupt, degrade, or destroy electronic equipment. Electrical contractors, technicians, and engineers purchase or lease these devices at considerable expense to satisfy their customer's power quality needs. So, how do you make the most of your money? Following the basic rules below will guarantee the power line monitor is a sound investment.

Where to start. You can save money by simply starting at the right place. You should gather as much information as possible about the site and occurring problems, prior to connecting the power line monitor. You can easily collect basic information by asking the customer questions like:

  • What kind of equipment is affected?

  • What are the symptoms?

  • When did the disturbances begin?

  • How often do they occur; for example, time of day, week, etc.?

Learning as much as possible about the electrical environment will help determine monitor location, connection (single- or three-phase), threshold settings, hookup, and monitoring duration.

Monitor location. Most companies believe the electric utility supply is the root of their AC voltage quality problems. As a result, they often connect the power line monitor to the main electrical service entrance.

However, most power line disturbances, especially transient events, result from equipment operation on the load side of the service. So instead of wasting your time and money, you may want to place the power line monitor where the afflicted equipment attaches to the electrical system; namely, the receptacle, panelboard, etc. This gives you a firsthand account of power line disturbance as seen at the input of the equipment.

Once you capture the disturbance, you can trace backward to find the root of the disturbance. The "signature" of the disturbance at the equipment location will also assist in the selection of a power-conditioning device, if necessary.

Monitor setup. Consider the environment where you will use the monitor. Like all microprocessor-controlled devices, it is susceptible to RFI/EMI, temperature, humidity, and electrostatic discharge. Also, secure the monitor so it is not subject to mechanical shock or vibration.

Threshold settings. Experience is the best teacher here. If the threshold settings are set too tight, the result is an overwhelming amount of meaningless information. On the other hand, if the thresholds are adjusted too loose, you won't capture the meaningful disturbances. It is helpful to know the input voltage tolerances of the affected equipment. If you don't know these, you may have to monitor the steady-state voltages for a brief period.

Once you know the typical ranges, you can set the monitor just above these values. You can also use the default threshold settings provided by the power line monitor manufacturer. Furthermore, this informational literature could be useful in offering insight on typical setting values.

Monitor hookup. If you aren't certain how to hookup the monitor, be sure to consult the manufacturer's literature for the proper connections. For safety, double-check the sense lead configuration before connecting to the circuit you wish to test. Improper connections of the leads to the monitor may damage the equipment, cause electric shock, or create a short circuit on the power system once the leads are terminated.

You may need to provide strain relief for the sense leads. This will prevent damage to the leads. It will also stop the leads from slipping off their termination point, which could result in acquiring erroneous information.

To prevent the monitor leads from picking up radiated EMI/RFI, it may be helpful to route the sense leads close to the metallic frame of the device you're monitoring. Try twisting the wires of each monitor channel together. And of course, always wear the appropriate safety gloves and glasses while making the physical connections to the circuit.

Monitoring duration. For most applications, you should monitor the power line for at least one business cycle (seven days). This will give you an accurate depiction of the events during peak- and low-demand power usage. However, if the plant's production schedule varies, you may need to monitor the electric power for a month.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues