Jiggling Can Be Dangerous

Even the best design cannot overcome an improperly installed, modified, or maintained electrical system.

As he looked inside the door of a motor starter to see what was preventing the unit from closing, the electrician paused to evaluate the electrical system. He quickly identified the problem: jammed interlocks—not such a big deal, he thought. In an attempt to clear the control circuit, he simply jiggled the engagement handle of the starter. At that instant, a short circuit occurred within the starter cubicle—leaving the electrician with serious burns and causing severe damage to the starter structure.

What triggered the unexpected short circuit? By jiggling the engagement handle, the electrician caused some loose conductive materials within the starter to fall between the phases of the primary connection terminals inside the starter cubicle. Proper design, installation, modification, or maintenance could have prevented this accident.

As in most cases, the injured party wanted some answers. The burned electrician hired an attorney to seek compensation for his suffering. The attorney hired a forensic mechanical engineer, who retained me to assist with the electrical specifics of the case.

I examined the burnt starter, burnt cubicle, an unburned identical starter, the repaired starter cubicle, specifications and drawings, manufacturer’s instruction book, facility’s installation and maintenance records, and supplemental reports made by other investigators and engineers. I also reviewed applicable industry electrical standards and interviewed the electrician. Finally, I submitted a report in conjunction with the mechanical engineer to the attorney. After reconstructing the incident, here are the steps leading up to the accident.

After the motor failed to start up during a changeover of pumps, the electrician came to troubleshoot the controls of the 2.4kVAC motor starter. He removed the starter from its cubicle and operated it with an external testing rig. The starter operated correctly in its external environment. However, it would not close when he reinserted it in its cubicle. (This facility had experienced problems with the starter’s engagement mechanism ever since the equipment’s original installation.)

Here’s where the problem started. Too often, electricians try to correct an electrical problem by jiggling an electrical device, mechanism, or switch. This act sometimes expels foreign material from a jammed mechanism. Other times, this motion can cause items to fall into proper alignment for conduction of electrical current. Occasionally, jiggling causes conductive materials to fall in such a way that allows an unplanned path for current flow—causing a short circuit. Whether the current path is to ground or phase-to-phase on polyphase systems, the erroneous electrical current flow typically results in damage to equipment or injury to anyone located near the current path.

This particular engagement mechanism contained safety interlocks, to prevent operation of the starter if the unit was not properly located within its cubicle. Someone had modified the starter’s mechanism to correct a prior engagement problem. However, a misalignment still existed. The specifications and drawings of this starter required placement of electrical insulation on each phase of the polyphase system. This phase insulation was an additional cost factor, since the phase bus bars were normally mounted bare on insulators.

After examining the equipment, I found the primary electrical connection terminals in the starter cubicle didn’t have insulation between them. Indentations existed between the primary connection terminals, but the drawings didn’t illustrate nor indicate the purpose of the indentations. Installers should have mounted phase barrier insulation upon the indentations. Instead, the indentations aided in the accumulation of foreign materials between the phases. The components of the starter’s operating mechanism were defective, and someone had modified them on site.

After inspecting the repaired starter cubicle, I found particles of machined metal inside. These metal particles could have resulted from the manufacture, installation, or modification of the starter. However, the manufacturer, installer, or modifier should have removed the metal particles before energizing the equipment. Furthermore, high-voltage dielectric testing after installation, modification, or maintenance would have revealed the presence of a defect in the starter’s insulating system. The insulating defect, lack of phase insulation at the primary connection terminals, and a jammed operating mechanism united in a disastrous short circuit.

The electrical design of this system should have incorporated insulation between phases at the primary connection terminals, using notations on the design drawings and instruction books to check for its proper location. Furthermore, power isolation switches should have been included in the design so an electrician could troubleshoot the operating mechanism of the starter without the main power on (thus not exposing the equipment and electrician to potential serious damage/injury). Power isolation switches would have prevented the electrician’s injuries.

I was not called to testify, because the matter settled out of court.The engineering lesson to be learned from this experience is simple: A defective design, installation, or maintenance can cause injury as well as damage equipment. Even the best design cannot overcome an improperly installed, modified, or maintained electrical system. And quite frequently, all four factors interact with disastrous consequences.

Shefchick, P.E., is a consulting forensic electrical engineer in Sunnyvale, Calif.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues