ECM Buyers' Guide
  

Short Circuits

Aug 1, 2004 12:00 PM

Everyone makes mistakes. Some are just funnier than others














Scare Tight

Years ago as an electrician for a major school district, I was working on a fire alarm system in an elementary school. While I was on-site, a staff member found me and excitedly said they needed my help — some children were trapped in a bathroom and couldn't get out. Sure enough, the door to a small bathroom on the second floor couldn't be opened by either the children stuck inside or the staff outside. It seems that someone had installed an exhaust fan through the bathroom wall, and it created a negative pressure that prevented the door from being opened. We couldn't locate the distribution panel that served the fan, and turning off circuits didn't help. So we decided to break out the lower panel on the door to relieve the vacuum. As soon as we did, the kids started climbing through the opening, heads and feet all at the same time.
Len Powell
Finksburg, Md.




Copy Shot

I was called to an automotive repair/body shop to install an outlet for a brand new copier. After scoping out the job, I found a subpanel 10 feet from the office where they wanted the outlet. I thought I'd install some pipe, wire, and the outlet and be out of there no problem. I finished cleaning up, but instead of grabbing my meter to prove my work, I just grabbed the cord and plugged in the machine to check for power. After the smoke cleared, I pulled out my meter and found there was 208V to neutral. It seems the electrician before me had fed the subpanel with the wild leg from the 3-phase, 120/240V delta panel. The only other circuits in the panel were a water heater and welder, so the wild leg had never shown up before. Thinking there was a neutral in the panel, I assumed that both legs were 120V. I hope someday I can meet the other electrician to see if he has an extra $1,300 to pay for that copier.
Doug Esser
Minnesota Lake, Minn.



Illustrations by Clint Metcalf




Got a story about a jobsite blunder? Send it to electrical_group@primediabusiness.com. If we publish it, we'll send you a check for $25.

Want to use this article? Click here for options!




Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 4, 2010 5:06 PM

Whats Wrong Here?

Jan 21, 2010 4:40 PM

What's Wrong Here?

Jan 7, 2010 12:47 PM

View all What's Wrong Here?

product of the week

Enclosures

February 8, 2010

Enclosures

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!



EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues