The basics of calculating voltage drop

How do you know if your wiring will provide a reasonable efficiency of operation? The National Electrical Code, 210-19(a) (FPN 4) and 215-2 (b) (FPN 3), recommends 5% voltage drop for feeder circuits and 3% for branch circuits. Let's work some examples, using the equations in the sidebar (right). Our examples use uncoated copper wire in steel conduit, for 480V branch circuits; we'll use NEC Table 9's power factor column.

Example 1: Determine voltage drop Run a No. 10 stranded wire 200 ft at 20A. Per Table 9, our "ohms to neutral per 1,000 ft" is 1.1 ohms. To complete the numerator, multiply as follows: (2 x 0.866) x 200 ft x 1.1 ohms x 20A = 7620.8 Dividing 7621 by 1000 ft gives a voltage drop of 7.7V. This drop is acceptable for our 480V circuit. A No. 12 would drop 11.8V. Boost the length to 500 ft, and that No. 10 drops 18V; the No. 12 drops 29V.

Example 2: Determine wire size Run a stranded copper wire 200 ft at 20A. You can find the wire size by algebraically altering the first equation, or you can use the following method. To complete the numerator, multiply as follows: 1.73 x 212.9 ohms x 200 ft x 20A = 89371.2 Dividing the 89371.2 by the acceptable voltage drop of 14.4V gives you 6207 circular mils. NEC Table 8 shows that a No. 12 wire satisfies the voltage drop recommendation.

Example 3: Determine wire length Run a stranded copper No. 10 wire for a 20A circuit. To complete the numerator, multiply as follows: 1000 x 14.4V = 14400 To complete the denominator, multiply as follows: (2 x 0.866) x 1.1ohms x 20A = 38.104 Finally, divide the numerator by the denominator, as follows: 14400 / 38.1044377 ft If you ran the No. 12 wire for the same circuit, you could run it 244 ft.

Example 4: Determine maximum load Run a stranded copper No. 10 wire for a 200 ft circuit. To complete the numerator, multiply as follows: 1000 x 14.4V = 14400 To complete the denominator, multiply as follows: (2 x 0.866) x 1.1 ohms x 200 ft = 381.04 Finally, divide the numerator by the denominator, as follows: 14400 / 381.04437A This circuit could handle 37A on each phase conductor. A 200 ft No. 2 could handle 24A.

* The number "0.866" is for 3-phase only. It converts the number "2" to "1.732" (the square root of 3). For single-phase circuits, don't use the "0.866" in the calculations. * "CM"denotes wire size in circular mils, as shown in Table 8. * To calculate wire size, use 12.9 as your K for copper and 21.2 as your K for aluminum. * "L" is the one-way wire length in ft. * "R" is the resistance per 1,000 ft. Use NEC Table 9 for AC wiring. If you have non-linear loads, use the column that helps account for power factor.

Equation 1: Calculating the actual Voltage Drop in volts Volts Dropped = (2 x 0.866) x L x R x Amps/1000

Equation 2: Calculating the Wire Size in circular mils CM = 2 x K x L x Amps/Acceptable Voltage Drop Alternatively, you can algebraically manipulate Equation 1 to: R410002Acceptable Voltage Drop/1.732 x L x Amps and then look up the wire size according to its AC resistance.

Equation 3: Calculating the Length in ft Length = 1000 x Acceptable Voltage Drop/ (2 x 0.866) x R x Amps

Equation 4: Calculating the Load in amps Amps = 1000 x Acceptable Voltage Drop/ (2 x 0.866) x R x L


 

Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues