The Art of Selection

On the surface, incorporating the concepts of selective coordination in the design of power distribution systems seems like a “no-brainer.” Why wouldn't you want to design a system that localizes an overcurrent condition and restricts the outage to the affected circuit or piece of equipment? We all know how much we've come to rely on 24/7 power in our homes and, more importantly, in our places of business. The entire loss of power in a high-rise condo, large office building, industrial plant, or hospital building is simply unacceptable in today's fast-paced “always-on” world.

But should the concepts of selective coordination be applied to emergency and standby systems too? Are there valid safety risks at play that should require us to incorporate these concepts into our electrical designs? More importantly, should these perceived safety risks merit specific Code requirements as set forth in the NEC? According to the 2008 NEC, the answer remains yes. However, there are those in the industry who disagree — and continue efforts to try and reverse the decision to make this a national mandate.

As an engineer, I tend to agree with their arguments, and wonder why the NEC must mandate the issue of selective coordination for emergency and standby systems. Incorporating these concepts into the design of these types of power systems can be very difficult to achieve, not to mention very costly to implement. Where's the background data that shows this is an issue that affects public safety?

As far as I know, NFPA 110, “Standard for Emergency and Standby Power Systems,” and IEEE Standard 242, “Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems,” both recognize selective coordination as a design consideration, not as a requirement. So why not leave this decision in the hands of the professional engineer until proven data clearly shows this to be an issue of public safety?

To learn more about this controversial issue, turn to the cover story on page 42 and take a look at what Staff Writer Beck Ireland dug up on this topic when speaking with some savvy engineers and Code specialists who are trying to work these requirements into their new designs. The information she presents on how some states and local jurisdictions are allowing exceptions to these requirements is quite interesting.

Do you agree with these exceptions, or do you feel the NEC should continue to mandate selective coordination for emergency and standby systems? I'm very interested in your feedback on this important topic. Please shoot me a quick e-mail at mike.eby@penton.com, and tell me what you think.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues