Basic Tools and Test Equipment to Get the Job Done

Dec. 15, 2015
Figure out the equipment and supplies you'll need throughout the work day and keep them close by.

At one time, it was common in many production facilities for the typical maintenance electrician to walk the floor with just a screwdriver and adjustable pliers in his back pocket. That transitioned to walking around with a tool pouch that had several screwdrivers and two sizes of adjustable pliers.

Things have advanced from there, including the carrying of an industrial DMM. But in your facility, have things advanced in the right direction? Or far enough?

You can get a head start by ensuring your tool pouch has the items you are most likely to need. Here’s an example for a maintenance electrician in a “typical” production plant:

  • Basic hand tools (multipurpose screwdriver, commonly used standard wrenches, adjustable wrench, commonly used Allen screw wrenches).
  • Various pliers (e.g., needle nose pliers, lineman’s pliers, pump pliers).
  • Wire strippers.
  • Spare test leads for your DMM.
  • Roll of 600V tape.
  • Roll of motor lead tape.
  • Flashlight.
  • Two locks and tags.
  • The two smallish items that you most often have to walk back to the shop to get.
Photo credit: Ryan McVay/Photodisc/Thinkstock

And what about the maintenance cart? If you’re doing preventive/predictive maintenance in the tool pouch and DMM mode, you’re no doubt making many unnecessary trips to and from the shop. It’s even worse if you are responding to downtime calls. Equip a cart so it covers the basic needs of both.

Here are suggestions for what a maintenance cart should have on board:

  • Additional hand tools, such as a ratchet set.
  • Shop rags.
  • Portable light (larger than flashlight).
  • Tachometer.
  • Rotation tester.
  • Infrared spot temperature gun.
  • Four lockout hasps.
  • Box of lockout tags.
  • Calibration stickers.
  • Plain label stickers.
  • Box of ink pens (seriously, you don’t want to make a round trip to the shop for a pen!) and/or felt marker pens.
  • Permanent marker.
  • Insulating blanket.
  • Box of nitrile gloves (do not use as electrical insulating gloves).
  • Tube of gasket material.
  • Boxes of solderless connectors (one box for each of the commonly used sizes).

The above lists may not work for your exact situation. They can serve as good starting points. Take the time to customize them so you aren’t making wasted trips. One way to determine if you’re carrying the right tools and supplies is by tracking how many trips you make back to the shop and which tools and supplies you had to get on each one.

If you pay attention to these basics, you will be more efficient and feel less pressured as you perform your various tasks. You also will end your day having walked fewer miles on concrete floors. Use that extra energy to do something you enjoy, but are often too tired to do, such as playing ball with the kids.

About the Author

Mark Lamendola

Mark is an expert in maintenance management, having racked up an impressive track record during his time working in the field. He also has extensive knowledge of, and practical expertise with, the National Electrical Code (NEC). Through his consulting business, he provides articles and training materials on electrical topics, specializing in making difficult subjects easy to understand and focusing on the practical aspects of electrical work.

Prior to starting his own business, Mark served as the Technical Editor on EC&M for six years, worked three years in nuclear maintenance, six years as a contract project engineer/project manager, three years as a systems engineer, and three years in plant maintenance management.

Mark earned an AAS degree from Rock Valley College, a BSEET from Columbia Pacific University, and an MBA from Lake Erie College. He’s also completed several related certifications over the years and even was formerly licensed as a Master Electrician. He is a Senior Member of the IEEE and past Chairman of the Kansas City Chapters of both the IEEE and the IEEE Computer Society. Mark also served as the program director for, a board member of, and webmaster of, the Midwest Chapter of the 7x24 Exchange. He has also held memberships with the following organizations: NETA, NFPA, International Association of Webmasters, and Institute of Certified Professional Managers.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.