Who's in Control Anyway?


An interesting debate has surfaced in the world of AC drives, pitting the mechanical engineer against the electrical engineer. The debate revolves around whether variable-frequency drives (VFDs) should be placed in Division 15 or 16 of the CSI MasterFormat specifications. This may not seem like a big deal to some of you, but the topic can generate a heated conversation in certain circles. To best present both sides of this argument, I decided to tap the expertise of two industry experts. Here are their opposing arguments for where VFDs should be located within the spec.

According to Dick Orndorff, product line manager, AC drives, Square D/Schneider Electric, specifying an AC drive typically requires more electrical than mechanical engineering considerations. And since an AC drive requires coordination for nearly every electrical parameter associated with a distribution feeder circuit, including cable size, harmonics, EMI, and RFI, it's only natural for an electrical engineer to specify, evaluate, and approve project specs that involve drives. His argument is supported by the fact that today's modern pulse width modulated (PWM), adjustable-frequency drives make motor coordination much easier than in the past.

Orndorff also feels that field modifications are much easier to coordinate when AC drives are specified in Division 16 because most problems result from actions like incorrect control circuit sequencing, improper grounding, line voltage transients, nuisance ground fault tripping, and emergency generator coordination. Solving these problems requires the careful coordination of the electrical contractor, the electrical specifying engineer, and the AC drive manufacturer.

On the other hand, Michael R. Olson, manager engineered drives, ABB, Inc., argues that project coordination/start-up is more complicated when VFDs are specified in Division 16. Changes in project scope often do not get transmitted effectively from the mechanical contractor to the electrical contractor. Further coordination difficulty can arise during start-up, as the mechanical contractor may better understand how fans and pumps are supposed to operate.

Olson also notes some key technical considerations to support his position, including: 1) long motor lead lengths, which he considers almost unavoidable in MCC construction; 2) potential EMI/RFI problems due to the use of MCC common wireways vs. grounded metal conduits; and 3) sole-source responsibility if vibration or another mechanical/operational problem arises, which he states is why drives were originally moved to the mechanical section some 20 yr ago.

As an electrical professional, I have to side with Mr. Orndorff and say the specifications should be placed in Division 16, because an AC drive is an electrical device, not a mechanical device. An AC drive isn't made with mechanical devices like dampers, valves, belts, pulleys, or gears. It consists of electrical components like diodes, rectifiers, inverters, reactors, and transformers. I consider drives to be just another individual component of the overall electrical power system. And who better to specify and coordinate these devices than the electrical engineer.

However, that's not to say the two sides shouldn't work together or share information with other disciplines. The electrical engineer must act responsibly and work closely with the mechanical engineer at all stages of the project. In fact, if this approach is taken right from the start of a project, this debate would probably disappear quietly. But that's just my opinion. I'd like to know what you think. Drop me an e-mail at meby@primediabusiness.com and let me know what side of the fence you're on.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues