Who's in Control Anyway?


An interesting debate has surfaced in the world of AC drives, pitting the mechanical engineer against the electrical engineer. The debate revolves around whether variable-frequency drives (VFDs) should be placed in Division 15 or 16 of the CSI MasterFormat specifications. This may not seem like a big deal to some of you, but the topic can generate a heated conversation in certain circles. To best present both sides of this argument, I decided to tap the expertise of two industry experts. Here are their opposing arguments for where VFDs should be located within the spec.

According to Dick Orndorff, product line manager, AC drives, Square D/Schneider Electric, specifying an AC drive typically requires more electrical than mechanical engineering considerations. And since an AC drive requires coordination for nearly every electrical parameter associated with a distribution feeder circuit, including cable size, harmonics, EMI, and RFI, it's only natural for an electrical engineer to specify, evaluate, and approve project specs that involve drives. His argument is supported by the fact that today's modern pulse width modulated (PWM), adjustable-frequency drives make motor coordination much easier than in the past.

Orndorff also feels that field modifications are much easier to coordinate when AC drives are specified in Division 16 because most problems result from actions like incorrect control circuit sequencing, improper grounding, line voltage transients, nuisance ground fault tripping, and emergency generator coordination. Solving these problems requires the careful coordination of the electrical contractor, the electrical specifying engineer, and the AC drive manufacturer.

On the other hand, Michael R. Olson, manager engineered drives, ABB, Inc., argues that project coordination/start-up is more complicated when VFDs are specified in Division 16. Changes in project scope often do not get transmitted effectively from the mechanical contractor to the electrical contractor. Further coordination difficulty can arise during start-up, as the mechanical contractor may better understand how fans and pumps are supposed to operate.

Olson also notes some key technical considerations to support his position, including: 1) long motor lead lengths, which he considers almost unavoidable in MCC construction; 2) potential EMI/RFI problems due to the use of MCC common wireways vs. grounded metal conduits; and 3) sole-source responsibility if vibration or another mechanical/operational problem arises, which he states is why drives were originally moved to the mechanical section some 20 yr ago.

As an electrical professional, I have to side with Mr. Orndorff and say the specifications should be placed in Division 16, because an AC drive is an electrical device, not a mechanical device. An AC drive isn't made with mechanical devices like dampers, valves, belts, pulleys, or gears. It consists of electrical components like diodes, rectifiers, inverters, reactors, and transformers. I consider drives to be just another individual component of the overall electrical power system. And who better to specify and coordinate these devices than the electrical engineer.

However, that's not to say the two sides shouldn't work together or share information with other disciplines. The electrical engineer must act responsibly and work closely with the mechanical engineer at all stages of the project. In fact, if this approach is taken right from the start of a project, this debate would probably disappear quietly. But that's just my opinion. I'd like to know what you think. Drop me an e-mail at meby@primediabusiness.com and let me know what side of the fence you're on.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues