What's My Short-Circuit Value?

Feb 1, 1999 12:00 PM, By Jerry R. Borland, P.E., Technical Editor


         Subscribe in NewsGator Online   Subscribe in Bloglines     

Here's why your electric utility won't and sometimes can't give you an available fault current value.

To adequately protect the distribution equipment in your plant, you must know its available short-circuit value. To getthis value, you call your local utility:but what you get instead is the size in kVA of its transformer, its percent impedance, and the lengths and types of distribution lines that feed your facility. Why won't the electric utility give a definite value for the short-circuit current? Having worked as a distribution engineer for an electric utility, this author offers the following comments.

It's a matter of time. Doing short-circuit current value calculations manually or with software programs takes time. Even a small distribution feeder could take weeks, months, or possibly longer. Because time is such an issue, most utilities perform short-circuit calculations only from the generation station through the transmission system, ending at the distribution system feeder terminals at the substation. You end up with information for protecting loads on the distribution feeder and short-circuit values at the substation.

It's a matter of knowledge. Most technicians, whom the utility employs to perform distribution level design work, are usually not sufficiently trained to solve these complex calculations. And though the utility usually has some type of nomograph depicting what type of protection will coordinate with an upstream protective device, it won't know the exact value of the short-circuit current at any point along its distribution system. Instead, it bases selection of protective devices on line-loading characteristics.

It's a matter of liability. Your utility uses assumed information that may change at any given moment. Most of these changes are a result of its distribution system reconfiguring.

You may wonder how your utility reconfigures its distribution system. (It reconducts a line to a different size, changes the line length, or upgrades a substation transformer.) These might happen due to line loading, emergency conditions, etc., and the changes can be temporary or long-term.

Let's look at an example of an emergency condition reconfiguration that becomes long-term. As shown in the diagram, the normal feed to your plant comes from Utility Substation No. 1. An animal invades the substation and causes a short circuit, taking this substation out of service for six months. To restore service to everyone fed from Substation No. 1, the utility reconfigures the line by closing Switch No. 2 and opening Switch No. 1. Now, the short-circuit current available at Location B changes.


Commenting terms of use blog comments powered by Disqus

Want to use this article? Click here for options!

product of the week

Evaluation Software

December 1, 2008 9:59 AM

Honeywell Power Evaluation Software

View all 2008 Products of the Week

Recent Comments

Follow comments on ecmweb.com




Arc Flash Conferences   Code Change Conferences

Professionals provide answers to your questions.



Do you have any technical paper explaining IBC?

iGard Resistance Grounding Q&A BookletDownload the Resistance Grounding Q&A Booklet
I-Gard
EC&M TV

Retrofit 2-Gang TV Box(TM)

Arlington’s recessed two-gang TV BOX™ for old work allows you to mount LCD and plasma TVs, and other system components flush against the wall.

Listen
"Sizing Gen-Sets: Facts, Hints, and Good Judgment"
Listen
Sponsored By:

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Back to Top

Browse Back Issues

Browse Back Issues