Stepping Up to the Plate for Interconnection


I recently attended my first Electrical Generating Systems Association (EGSA) convention at the historic La Mansion del Rio Hotel, which sits right on the River Walk in downtown San Antonio. I found many of the general session presentations to be both valuable and interesting. However, one really piqued my interest. Jason Lin, vice president and chief engineer, GE Zenith Controls, Inc., provided an overview of an IEEE working group's effort to produce a uniform standard for the interconnection of distributed resources with electric power systems in his presentation, A New National Interconnect Standard for On-Site Generation. The original scope of IEEE Standard P1547 is to provide requirements relevant to the performance, operation, testing, safety considerations, and maintenance of the interconnection of distributed resources with electric power systems. Unfortunately, as is the case with most standards-making efforts, completing this task has proved much more difficult than originally anticipated.

The IEEE first approved this project in March 1999 and immediately placed it on a fast track schedule for early completion. However, after many draft revisions and failed ballots, the standard has yet to gain the approval of its balloting members, broken up into three groups — users, producers, and a general interest category. The user category is represented by large utilities like Pacific Gas and Electric Co., American Electric Power, Consolidated Edison, Inc., and Entergy. Companies such as Caterpillar, ASCO, Siemens Westinghouse, Cummins, Basler Electric, and International Fuel Cells represent the producer category. The general interest category includes anyone who doesn't fall within the user or producer category.

Why has this standard failed to gain the much-needed approval of its balloting members? Because its' original scope was found to be too broad. Recognizing this flaw, the working group recently announced a revision to the scope of P1547 focusing on the mandatory, minimum technical requirements needed to assure a sound interconnection and removal of information like procedural requirements, application guidance, safety practices, specific DR-EPS applications, equipment-specific criteria, types of utility grids, operational aspects, and regulatory aspects. In addition, it's creating three new interconnection standards projects: P1589 Draft Standard for Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems; P1608 Draft Application Guide for IEEE Std. 1547; and a new standards project for the monitoring and control of distributed resources. The working group's Chair Richard DeBlasio, technology manager, National Renewable Energy Laboratory, reported a new P1547 draft would require the dissolution of the existing ballot group and the establishment of a new ballot group. The standard's writing group would also need to be expanded to maintain its balance according to IEEE voter categories. Hopefully, these new efforts to refine P1547 will soon result in consensus approval of this much-needed industry standard.

Development and approval of new distributed generation standards is critical to the continued safe and reliable operation of our nation's electric power infrastructure, but it's an enormous undertaking. I applaud those individuals who are working so hard to create these new standards for our industry.

And as for the rest of you, why don't you step up to the plate and help make this happen. I'm sure the working group would welcome you with open arms.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues