Christmas in November

Understanding the most important Code changes in the 2011 change cycle

I always experience a bag of mixed emotions this time of year — when I check the mail bins at work and realize I’ve received a package from the National Fire Protection Association (NFPA). My initial reaction is one of pure excitement. When I tear open the box and get my first glimpse of the newest version of the National Electrical Code (NEC), I feel like a kid on Christmas morning opening his first present. The cover is shiny, and the pages are all aligned perfectly. There are no frayed edges, torn pages, or post-it notes/tabs sticking out from all sorts of weird angles. It even has that new book smell.

My excitement quickly fades, however, when I realize what lies ahead. I picture myself spending countless hours studying the highlighted text throughout this nearly 900-page document. Knowing that I must review the entire document to familiarize myself with the enormous number of changes that have been made, I feel a bit anxious, wishing I had another box to tear into.

I realize it can sometimes take years for your local code authority to adopt the newest version of the NEC. This is why many of you tend to ignore the initial launch of this product in the short term, adopting a business-as-usual attitude. But sooner or later, almost all electrical professionals will have to abide by the requirements of this version of the Code, especially if you find yourself branching out and working in new geographic territories. So why not take the proactive approach and get ahead of the game by studying the changes now rather than later?

Fortunately for you, we’re here to help ease your fears and lessen your workload. As we’ve done for many years, EC&M enlisted the services of our NEC expert Mike Holt to bring you the Top 25 Code Changes associated with the 2011 version of what many of us view as the industry Bible. Starting on page 14 of this special issue, we present the most important changes that have been adopted in this latest change cycle. In fact, we devote 19 pages of this month’s issue to this one special article. Here’s a preview of the key changes you’ll read about in this comprehensive review:

  • Available fault current must now be listed on some types of equipment.
  • GFCI devices are now required in more areas, and they must be installed at readily accessible locations.
  • AFCI protection has been expanded in dwelling units.
  • Bonding and grounding requirements have been clarified for separately derived systems.
  • Expansion of the rule requiring identification of electrical ceiling support wires.
  • An extensive rewrite of the conductor ampacity requirements.
  • A new rule requiring a neutral conductor at nearly every switch point.
  • Tamper-resistant receptacles are now required in additional facilities.
  • Revision of the bonding requirements for swimming pools.

Don’t miss out on this valuable learning opportunity. Find a quiet place and set aside enough time to truly focus on the implications these Code changes will have on your work and your business. Consider it our little pre-holiday gift to you — minus the card, of course.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

LED replacement lamp

May 22, 2012 8:12 AM

LED replacement lamp

The Array LED BR30 replacement lamp features an enhanced dimming circuit and the company’s second-generation Selective Heat Sink Technology...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Date: Thursday, May 24, 2012
Time: 2:30pm ET


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register Today!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues