Hurricane Sandy: A Turning Point for Emergency Power?

Hurricane Sandy and its aftermath raise questions about the sufficiency of flooding protections for back-up power systems

« 

Discuss this Article 2

Gerardo Pérez (not verified)
on Mar 11, 2013

A good practice in engeneering is to consider the pump systems for drain or flood water with the same specs of a Firepump, that is, no need of a overload protection, 600% or brakeshaft current, as overcurrent protection, the trayectory must be independent of another circuits, etc.
May be its time to consider as a standard.

bschuerger
on Mar 11, 2013

This is a good article as far as it goes. How did the critical infrastructure for the police, fire departments and civic officials do? Has NYC or any of the cities in NJ designated any of their facilities as Critical Operations Power Systems (COPS) per NEC article 708? The answer may surprise you, as I seriously doubt there is any facilities in the whole area that have been designated COPS. Which tells you that NFPA can do very little about it, as NO ONE is using what already exists.

Post new comment
Sign In or register to use your Electrical Construction & Maintenance (EC&M) Magazine ID
(optional)

White Papers
EC&M Learning Center
Webinars
EC&M TV
Feb. 28, 2011
video
Electrical Construction and Maintenance

Arlington CP9000

Arlington’s new 9” diameter ceiling cover plate is the neatest way to cover unused “high hat” cans. With no tools needed, installation couldn’t be faster! CP9000’s spring anchor brackets slip between the turned down metal tabs inside the “can” or directly to the “can”....More

Newsletter Signup

Connect With Us