Shell WindEnergy plans to construct wind farm

July 29, 2003
In a joint venture with Padoma Wind Power, Shell WindEnergy, Inc. will build a wind farm at a site 90 miles southeast of Lubbock, Texas. The wind farm will consist of 160 Mitsubishi MWT 1,000A wind turbines, some of which will stand 226 ft tall and weigh more than 370,000 lb. The total output will generate enough electricity to power about 30,000 homes. The project is due to be completed by the end

In a joint venture with Padoma Wind Power, Shell WindEnergy, Inc. will build a wind farm at a site 90 miles southeast of Lubbock, Texas. The wind farm will consist of 160 Mitsubishi MWT 1,000A wind turbines, some of which will stand 226 ft tall and weigh more than 370,000 lb. The total output will generate enough electricity to power about 30,000 homes. The project is due to be completed by the end of 2003.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.