Major BIM Research Study for the Construction Industry

Dec. 15, 2011
In partnership with Stevens Construction Institute, the University of Florida's Center for Advanced Construction Information Modeling (CACIM) has developed a research questionnaire to assess the maturity and quality of BIM implementation within the Architecture, Engineering, Construction and Operations (AECO) industry

In partnership with Stevens Construction Institute, the University of Florida's Center for Advanced Construction Information Modeling (CACIM) has developed a research questionnaire to assess the maturity and quality of BIM implementation within the Architecture, Engineering, Construction and Operations (AECO) industry. Below is a link to a brief survey of 21 questions hosted on Zoomerang which is divided into three parts:

Part I: Demographics

Part II: Organizational BIM Maturity

Part III: Project-Wide BIM Maturity

All responses will remain confidential and the results will be used for research purposes only. To express our gratitude for your generous participation, you will receive a short summary of the study and its findings via email on March 15, 2012. Thank you for your time and participation. We appreciate your support and look forward to sharing the anonymous results with you!

Survey Link: http://www.zoomerang.com/Survey/WEB22E6WJQ72UV

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.