If you have flammables on site, you must follow the relevant requirements of the first few Articles in Chapter 5 of the NEC.

If you have flammables on site, you must follow the relevant requirements of the first few Articles in Chapter 5 of the NEC. If you apply Art. 505 as an alternative to the division classification system (covered in Art. 500 for Class I, Zone 0, 1, and 2), you could easily get confused about Material Groups [505.6].

"Material Groups" may not be the best wording for what this actually means, but it's not nearly as complex as it might seem. First, it doesn't address oxygen-enriched environments. Second, there are only three groups: A, B, and C (oddly enough, group A and C swap places in the NEC numbering system). Each Group addresses specific gases. Just look in the group listing for any gas you have, and apply Table 505.7(D) and Table 505.9(C)(1)(2) accordingly.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

Strut Comparison Chart

Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

NECA Manual of Labor Rates Chart

See how Champion Fiberglass compares to PVC, GRC and PVC-coated steel in installation.

Electrical Conduit for Bridges Guide

Learn about electrical conduit for bridge projects.