Architecture Billings Index Remains in Reverse

June 28, 2011
On the heels of a sizeable decrease in April, the Architecture Billings Index (ABI) slowed even further in May

On the heels of a sizeable decrease in April, the Architecture Billings Index (ABI) slowed even further in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine- to 12-month lag time between architecture billings and construction spending. The American Institute of Architects (AIA) reported the May ABI score was 47.2, a slight decrease from a reading of 47.6 the previous month. This score reflects a continued decrease in demand for design services (any score above 50 indicates an increase in billings). The new projects inquiry index was 52.6, down from a mark of 55.0 in April, its lowest level in almost a year and a half.

“Whatever positive momentum that there had been seen in late 2010 and earlier this year has disappeared,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “The broader economy looks to be entering another soft spot, and certainly state budget constraints are adversely affecting the profession’s ability to work on institutional projects. But there is no denying that the prolonged credit freeze from lenders for financing commercial projects is the number one challenge to a recovery for the design and construction industry.”

Key May ABI highlights:

  • Regional averages: West (49.3), Northeast (47.6), South (47.5), Midwest (45.9)
  • Sector index breakdown: multi-family residential (53.6), mixed practice (49.1) commercial/industrial (46.5), institutional (44.9)
  • Project inquiries index: 52.6

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.