A/E/C Firm Executives Anticipate Rise in Design/Build Work

About 80% of architecture, engineering, construction, and integrated design/build firm leaders who responded to a recent survey expect an increase in the use of design/build over the next five years. ZweigWhite, a Natick, Mass.-based management consulting firm, surveyed 150 construction industry executives for its 2004 Design/Build Survey of Construction Firms and found that design/build often occurs

About 80% of architecture, engineering, construction, and integrated design/build firm leaders who responded to a recent survey expect an increase in the use of design/build over the next five years. ZweigWhite, a Natick, Mass.-based management consulting firm, surveyed 150 construction industry executives for its 2004 Design/Build Survey of Construction Firms and found that design/build often occurs in four different ways — a single firm has in-house design and construction capabilities, the designer and contractor forge a joint venture, a contractor leads the project team, or a designer leads the project team. Lower costs and a single point of responsibility are considered design/build's biggest advantages, and a higher level of risk is considered its primary disadvantage. Since many contracting firms already have bonding capacity and are able to assume greater risks, they're more likely to dominate the design/build relationship, according to the report.

Discuss this Article 0

Post new comment
Sign In or register to use your Electrical Construction & Maintenance (EC&M) Magazine ID
(optional)

White Papers
EC&M Learning Center
Webinars
EC&M TV
Apr. 15, 2013
video

The Westex Difference

Learn what sets Westex apart from other flame resistant fabric manufacturers....More

Newsletter Signup

Connect With Us