EGC Requirements at Carnivals, Circuses and Fairs

March 11, 2014
Equipment grounding conductors of all the sources of supply that serve portable structures at carnivals, circuses and fairs, separated by less than 12 ft, shall be bonded together at the portable structures.

Where multiple services or separately derived systems supply portable structures of carnivals, circuses, or fairs, all structures separated by less than _____ shall be bonded together at the portable structures.

a) 8 ft
b) 10 ft
c) 12 ft
d) 14 ft

See answer and applicable Code reference

The correct answer is: c) 12 ft

According to Section 525.11 of the 2011 NEC, "where multiple services or separately derived systems, or both, supply portable structures, the equipment grounding conductors of all the sources of supply that serve such structures separated by less than 3.7 m (12 ft) shall be bonded together at the portable structures."

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.

Champion Strut Catalog

Champion Fiberglass is the most advanced manufacturing facility of fiberglass conduit, fiberglass bridge drain and fiberglass strut systems in the world. Its well-trained and ...

8 Types of Electrical Conduit and Their Uses

Electrical conduit is a tube or raceway used to house and protect electrical wires within a building or structure. From data centers to underground subways to ports and bridges...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...