Outside Branch Circuits and Feeders, Part 2

Jan. 19, 2016
The first requirement is that the branch circuits must comply with Art. 210, which covers branch circuits [225.7(A).]

What about installing lighting equipment outdoors? You can find these requirements in Sec. 225.7 of the NEC. The first requirement is that the branch circuits must comply with Art. 210, which covers branch circuits [225.7(A)]. The additional requirements these must meet are in Sec. 225.7(B) through (D).

B) Determine the maximum net calculated load current between the neutral conductor and all ungrounded conductors connected to any phase of the circuit. This value is the minimum ampacity of the common neutral.

C) To supply luminaires for outdoor areas of industrial, commercial, or public buildings, the circuits cannot exceed 120V (nominal) between conductors or 277V (nominal) to ground.

D) If you’re supplying the auxiliary equipment of electric-discharge lamps, the circuits are allowed to exceed 277V but not 600V to ground.

What about neon signs? Don’t those operate at higher voltages than permitted here? Yes, they do. But the branch circuits supplying them don’t. Neon and other types of electric signs are covered in Art. 600.

Note that a common problem with outdoor lighting is voltage drop. When determining the necessary conductor size, don’t stop with the ampacity table value.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Don't Let Burn-Through Threaten Another Data Center or Utility Project

Get the No Burn-Through Elbow eGuide to learn many reasons why Champion Fiberglass elbows will enhance your data center and utility projects today.

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.