What's Wrong Here? August Winners

Nov. 1, 2000
The following electrical professionals all identified the Section 250-64(e) in the 1999 NEC as the reference that could be cited in the violation.1) Shree Khaitan2) R.E. Shaffer Mobile, Ala.3) Joe Griffin Master Electrician Loyola College4) Eric Henry, DMJM Electrical Engineer Arlington, Va.5) Duke Schamel President Copperhead Electric La Habra, Calif.6) Terry Landers, VP Landers Electrical Co. Inc

The following electrical professionals all identified the Section 250-64(e) in the 1999 NEC as the reference that could be cited in the violation.

1) Shree Khaitan

2) R.E. Shaffer Mobile, Ala.

3) Joe Griffin Master Electrician Loyola College

4) Eric Henry, DMJM Electrical Engineer Arlington, Va.

5) Duke Schamel President Copperhead Electric La Habra, Calif.

6) Terry Landers, VP Landers Electrical Co. Inc North Andover, Mass.

7) Bill Spencer Electrical Project Engineer Collaborative Design, Inc. Atlanta, Ga.

8) Bob Van De Car VDC Electric Boyne City, Mich.

9) Sonny Peifer Electrical Tech Instructor UniTec Career Center Bonne Terre, Mo.

About the Author

CEE NEWS STAFF

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Don't Let Burn-Through Threaten Another Data Center or Utility Project

Get the No Burn-Through Elbow eGuide to learn many reasons why Champion Fiberglass elbows will enhance your data center and utility projects today.

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.