Changes in the 2002 NE Code

Img src= "http://industryclick.com/images/editorial/magazine/70x75/26/NEC.gif"> This series of articles will summarize about 220 significant changes in the 2002 NEC. These articles are intended to give the reader an overview of the types of changes that have been made during the last three-year Code development cycle. The NE Code panels considered more than 4,000 proposals and more than 2,000 public

Discuss this Article 0

Post new comment
Sign In or register to use your Electrical Construction & Maintenance (EC&M) Magazine ID
(optional)

White Papers
EC&M Learning Center
Webinars
EC&M TV
Feb. 28, 2011
video
Electrical Construction and Maintenance

Arlington CP9000

Arlington’s new 9” diameter ceiling cover plate is the neatest way to cover unused “high hat” cans. With no tools needed, installation couldn’t be faster! CP9000’s spring anchor brackets slip between the turned down metal tabs inside the “can” or directly to the “can”....More

Newsletter Signup