Author Guidelines

We are always looking for technically accurate, well-written articles on topics of interest to our readers. EC&M editors must balance many factors in determining how much material will appear for any given article. And an accepted article may take months to appear--for a variety of reasons. In keeping with a series of legislative and judicial decisions that have occurred over the past five years, we do require a copyright contract for the protection of both parties.

    These are our readers:
  • Electrical contractors (project managers, estimators, designers, on-staff electrical engineers, field superintendents, and general foremen)
  • Consulting electrical engineers
  • Plant/facility electrical maintenance personnel
  • Electrical inspectors
  • Equipment-repair personnel (testing and apparatus maintenance companies).

    This is what we write about:
  • Lighting and control
  • Motors and controllers
  • Testing and maintenance
  • National Electrical Code
  • Power distribution
  • Safety and training
  • Voice/data/video
  • Installation methods
  • Emergency and standby power
  • Security and life safety
  • Power quality
  • Market and construction trends
  • Business and software

We focus on low- (600V and below) and medium-voltage (above 600V to 35kV) systems, equipment, and feeders. Our coverage begins where the utility service ends. Thus, we’re not interested in articles on utility generation or transmission.

Interested in submitting an article?
Here’s what you should do. First, submit a short outline or abstract to the editor. Include your name, title, company, e-mail address, and phone number in the body of the e-mail. After you and the editor agree to proceed, write your article text and e-mail it as an attachment when you are done. Once the editor has your article text in hand, he or she will notify you of the publication target date. We hope to see your byline soon.

Here are a few do's and don'ts to consider when submitting supporting graphics with your text.

    DO'S
  • Mail original color slides or photos to EC&M at 9800 Metcalf Ave., Overland Park, Kan., 66212. Note: We do not pay photographers hired by outside authors.
  • We can electronically create diagrams from your diagrams and sketches, but prefer that you e-mail us an electronic version to work with. We accept only high-resolution and high-quality photos that are 300 dots per inch (dpi) and are in a TIFF, EPS, or JPEG format.
  • If you provide a photo, diagram, or illustration that’s the property of someone else (e.g., from a textbook or a manufacturer’s literature), you must include a letter of permission from the owner.

    DON'TS
  • Do not send photos of unsafe acts. Ensure people in the photos are wearing their Personal Protective Equipment (such as safety glasses) as required by whatever job they are doing in the photo.
  • Do not embed drawings, tables, or graphics in applications like Word. We process the text and the graphics separately.

Here’s the kind of artwork we prefer to receive:

Type of artwork Examples of use Suggested program
Charts Pie charts of demographics Excel
Drawings Simplified wiring diagrams CAD package
Flow charts Process diagrams Process diagram package
Graphs Motor torque curves Excel or PowerPoint tables
Tables Handy lists Excel

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

Garage/utility lamp

May 16, 2012 9:26 AM

Garage/utility lamp

A suitable replacement for existing high-intensity discharge (HID) or high-pressure sodium (HPS) lamps, the 52W LED-8025 garage/utility lamp is designed for low-bay applications ...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

Grounding Versus Bonding
Date: Thursday, May 24, 2012
Time: 2:30pm ET


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register Today!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues