Code Quiz: Handhole Enclosure Requirements 
With respect to wiring entries, such as a schedule 80 PVC raceway installed underground entering into a handhole enclosure, a schedule 80 PVC raceway shall be mechanically and electrically connected to the handhole enclosure by ______.
Code Quiz: RMC Threadless Couplings and Connectors  1
When installing listed threadless couplings and connectors on rigid metal conduit (RMC), where buried in concrete or masonry, the couplings and connectors shall be ______.
Code Quiz: IMC Used in Corrosive Environments 

When installing intermediate metal conduit (IMC), elbows, couplings and fittings in corrosive environments, such as in concrete or direct contact in the earth or areas subject to severe corrosive influences, the IMC shall be protected by corrosion protection and _________________.

Code Quiz: Pendant Box Support Requirements  1
When installing a single rigid metal or intermediate metal conduit to support a pendant box that supports a luminaire, the threaded joints shall be prevented from loosening by _______.
Code Quiz: Support Wire Requirements in Suspended Ceilings 
When installing an enclosure (such as a 4 x 2 1/8 in. square metal box) above a suspended ceiling by means of support wires, the enclosure shall be secured using _________. The support wires shall be _____ within the ceiling cavity.
Code Quiz: Raceways in Wet Locations Abovegrade 

When installing a THHN / THWN insulated conductor in a raceway that is located on the outside wall of a building or structure (wet location), the choice for the type of conductor insulation is permitted to be based on _____________.

A. the use of THHN insulation rating, based on a dry location rating, as the inside of the raceway is considered to be a dry location. The installation shall also comply with  310.10(C).

Code Quiz: Sizing the Grounding Conductor for a Single Raceway 
Why is the term “grounded conductor” included in the heading of new Table 250.102(C)(1)?
Code Quiz: Service Masts as Supports 
When attaching service-drop or overhead service conductors to a service mast, they shall not be attached between a weatherhead or the end of a conduit and a coupling,
Code Quiz: Hubs and Service Masts 
When installing a rigid metal conduit that serves as a service mast, the hub installed as part of this system shall be __________.
Code Quiz: Underground Service Conductors 
When installing disconnecting means for outside feeders and branch circuits, if the disconnecting means installed in accordance with Sec. 225.32 of the 2014 NEC is not readily accessible, it shall be _________.
Code Quiz: Disconnecting Means for Outside Feeders and Branch Circuits  1
When installing disconnecting means for outside feeders and branch circuits, if the disconnecting means installed in accordance with Sec. 225.32 of the 2014 NEC is not readily accessible, it shall be _________.
Branch Circuits for EV Charging Equipment Outlets 
When installing outlets for the purpose of charging electric vehicles, the branch circuit supplying the outlets shall ___________.
Code Quiz: AFCI and GFCI Protection  4
In which area of a dwelling unit are both GFCI and AFCI protection required?
Code Quiz: Ground Fault Protection of Equipment 
Which of the following installations does not require ground fault protection of equipment?