Frederic P. Hartwell

Frederic P.
Hartwell
Articles
Receptacle configurations on highly loaded circuits.
There are circumstances when a plug and receptacle configuration can be used above the normal limit of 80% of their rating.We received some manufacturer's
Is unobstructed workspace required at all times?
Although switchgear must be readily accessible and meet minimum working clearances, the entire workspace need not be readily accessible.The drawing shows
Electrical Testing Feed
Join the Discussion on EC&M Talk

EC&M Webinars
Jul 21, 2015
Sponsored

Mitigation Methods for Arc Flash Hazards - Enhancing Personal Safety

The energy released during an arc flash event can result in severe damage to personnel, equipment, and property. While there are solutions which seek to improve the protection for each, this program will focus on personnel....More
Jul 14, 2015
Sponsored

Understanding the 2015 Edition of NFPA 70E and the Arc Flash Hazard

Get more information on the important changes to the 2015 edition of NFPA 70E. More specifically, this event will address hazard analysis and FR clothing performance testing, focusing on the quantification of incident energy and ATPV (or Arc Rating)....More
EC&M Learning Center

Connect With Us

Sponsored Introduction Continue on to (or wait seconds) ×