Christopher Shiver

Christopher
Shiver
President,
Chris Shiver, P.E. LLC
Articles
The Case of the Secondary School Fault 23
Electrical contractor’s failure to verify integrity of cable insulation results in arc flash event, injury, and litigation

EC&M Learning Center

 

Newsletter Signup

Connect With Us

Sponsored Introduction Continue on to (or wait seconds) ×