When Circuit Boards are Toast, Part 10

Sept. 13, 2011
Previously, we said a neutral-ground (N-G) bond might be upstream of the receptacle where measurements indicate the existence of the bond. We also said that if you didn't find it at the supply panel to check the other equipment on that panel. Fixing ...

Previously, we said a neutral-ground (N-G) bond might be upstream of the receptacle where measurements indicate the existence of the bond. We also said that if you didn't find it at the supply panel to check the other equipment on that panel. Fixing this in an efficient manner will require some scheduled downtime. Using the panel directory, you can probably identify the connected loads; however, verify with current drawings. Then, ensure the wiring for each circuit is properly and accurately labeled.

Arrange to do the work when production shuts down for lunch, between shifts, or at some other time the affected production manager agrees will minimize interruption of production. The amount of time required will depend on how many circuits are on that panel.

You will need two people: one at the receptacle to measure N-G, and one at the panel to disconnect and reconnect loads.

  1. Open each breaker, and then open the panel main.
  2. Disconnect the wiring at each breaker except the one supplying the control panel receptacle.
  3. Connect one circuit, close the breaker. Close the main. Note whether measurement at the control pane receptacle shows an N-G bond or not.
  4. Disconnect. Open the breaker. Repeat this and the preceding step for all other breakers.
  5. Reconnect all breakers. Close them one at a time.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.