EC&M Article Archive


Ladder stabilizers 

Jan 20, 2012, 

Made from corrosive-resistant 6061 grade aluminum, these ladder stabilizers are designed to provide extra safety to combo and extension ladders...

Fire alarm communicator 

Jan 19, 2012, 

The IPGSM-DP fire alarm communicator offers users a choice of either internet protocol (IP) or global system for mobile communications (GSM) cellular as its primary communications pathway...

Magnetic drivers/transformers 

Jan 18, 2012, 

The TL576 Series of Class 2 magnetic drivers/transformers is designed for driving the company’s Mini LED downlights and gimbals...

Knives 

Jan 17, 2012, 

This line of professional knives is designed for repetitive cutting applications that require blades to be replaced frequently...

Cable test tool 

Jan 13, 2012, 

The Snap Shot finds cable length, impediments in the cable, and conditions at the end of wires in data, power, or communications/video systems up to 3,000 ft...

Faith Technologies Works on Fort Riley Replacement Hospital 

Jan 12, 2012, 

Faith Technologies has partnered with Bergelectric in a joint venture to provide the electrical construction services for Irwin Army Community Hospital in Fort Riley, Kan....

Connecticut Company Thrives in Down Economy 

Jan 12, 2012, 

Connecticut home generator systems strives to find qualified employees...

Jobsite storage equipment 

Jan 12, 2012, 

The Model 119-01 Field Station functions as a jobsite office...

Fluorescent lamps 

Jan 11, 2012, 

ProLume F49T5/HO linear fluorescent lamps reduce energy consumption by more than 9% while maintaining nearly equal light output of a standard 54W lamp...

Work Smarter, Not Faster 

Jan 10, 2012, 

The economy has put pressure on maintenance departments to be more efficient...

Electrical Troubleshooting Quiz, Jan. 10, 2012 

Jan 10, 2012, 

One of your buildings is called "the cable morgue" because there's a cable failure every few months...

Replacing Cables, Part 3 

Jan 10, 2012, 

A cable failed, and you've run temporary cabling to bypass it...

NEC in the Facility, Jan. 10, 2012 

Jan 10, 2012, 

Requirements for electrical installations are noted in Art. 110...

Safety, Jan. 10, 2012 

Jan 10, 2012, 

A flammable material will burn only when the air contains a sufficient concentration of it...

Voltage transducer 

Jan 10, 2012, 

Packaged in a 35-mm-wide DIN-rail enclosure, the VTD Series senses voltage in a wide variety of DC-powered installations...

Faith Technologies Launches New Website Dedicated to Electrical Risk Managment Service 

Jan 9, 2012, 

Faith Technologies recently announced the launch of a website dedicated to its electrical risk management (ERM) service offering. ...

EMCOR Group, Inc. Subsidiary Awarded Contract For Design/Assist And Electrical System Retrofit For Los Angeles Hall Of Justice 

Jan 9, 2012, 

EMCOR Group, Inc. recently announced that its Dynalectric Los Angeles subsidiary has been awarded a contract for the design/assist and retrofit of the electrical systems for the Los Angeles Hall of Justice in Los Angeles, Calif....

Relays 

Jan 9, 2012, 

The company has expanded its electromechanical relay offering to include power and hazardous location styles...

Gen-set software tool 

Jan 6, 2012, 

Available now for PC users, SpecSizer version 2.7.0 features a20-Step Wizard that automatically calculates the least number of steps for building a load scenario...

Arc flash labeling kit 

Jan 5, 2012, 

The DuraLabelPRO300 arc flash labeling kit includes a DLP300 thermal transfer printer that offers 300 dpi resolution and prints supplies up to 4 in. wide...

Cupertino Electric Completes Half-Megawatt Solar System for The City of Morgan Hill to Save Nearly $100,000 Annually in Electricity Costs 

Jan 4, 2012, 

The Energy Alternatives Division of Cupertino Electric, Inc. (CEI) recently announced the completion of a rooftop and parking lot canopy-based 480.34kW solar PV system for the City of Morgan Hill in Morgan Hill, Calif....

Metal-halide lamp 

Jan 4, 2012, 

The Cera Arc is a ceramic metal-halide ED mogul base lamp...

Field data software 

Jan 3, 2012, 

Singletouch Mobile software can now be deployed on Motorola MC9090 handhelds or on the HP Slate tablet...

Patti Engineering Provides Textile Automation Technology to Inman Mills Manufacturing Facility 

Dec 30, 2011, 

Patti Engineering, Inc. announced the successful completion of an automation project at Inman Mills, Inman, S.C....

Variable speed drive 

Dec 30, 2011, 

The AF-600 F11 redundant drive is suitable for applications where a full- or reduced-voltage bypass cannot be used because the control and functionality of an adjustable-speed drive is always required...

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 | 87 | 88 | 89 | 90 | 91 | 92 | 93 | 94 | 95 | 96 | 97 | 98 | 99 | 100 | 101 | 102 | 103 | 104 | 105 | 106 | 107 | 108 | 109 | 110 | 111 | 112 | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 123 | 124 | 125 | 126 | 127 | 128 | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | 138 | 139 | 140 | 141 | 142 | 143 | 144 | 145 | 146 | 147 | 148 | 149 | 150 | 151 | 152 | 153 | 154 | 155 | 156 | 157 | 158 | 159 | 160 | 161 | 162 | 163 | 164 | 165 | 166 | 167 | 168 | 169 | 170 | 171 | 172 | 173 | 174 | 175 | 176 | 177 | 178 | 179 | 180 | 181 | 182 | 183 | 184 | 185 | 186 | 187 | 188 | 189 | 190 | 191 | 192 | 193 | 194 | 195 | 196 | 197 | 198 | 199 | 200 | 201 | 202 | 203 | 204 | 205 | 206 | 207 | 208 | 209 | 210 | 211 | 212 | 213 | 214 | 215 | 216 | 217 | 218 | 219 | 220 | 221 | 222 | 223 | 224 | 225 | 226 | 227 | 228 | 229 | 230 | 231 | 232 | 233 | 234 | 235 | 236 | Next

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

Garage/utility lamp

May 16, 2012 9:26 AM

Garage/utility lamp

A suitable replacement for existing high-intensity discharge (HID) or high-pressure sodium (HPS) lamps, the 52W LED-8025 garage/utility lamp is designed for low-bay applications ...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

Grounding Versus Bonding
Date: Thursday, May 24, 2012
Time: 2:30pm ET


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register Today!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues